Community Housing Projects

Alfa Mwanda Housing Project

The project is located in Nakuru town at Lanet area. The land is approximately 4.6 acres. The project includes; 33 No. Two-room and toilet units with a floor area of 23sqm. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 10 months
Project Status: 100% (practical completion & handed over).

Faith Foundation Housing Project

The project is located in Ruiru town along Nairobi-Thika Superhighway. The land is approximately 2.5 acres. The project includes; 52 No. Three-room and toilet units with an area of 50sqm. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 08 months
Project Status: 100% (Handed over).

Kabiria Housing Project

The project is located 30km North of Nairobi town at Kikuyu. The land is approximately 2.5 acres. The project includes; 37 No. Two-room and toilet units with an area of 32sqm all semi-detached. Alternative building technology adopted is use of box-profile metal sheets. Associated external works and services includes access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 03 months
Project Status: 50% (Construction in Progress).

Mutindwa/Good Neighbours Housing Project

The project is located 30km east of Nairobi town along Ruai-Kangundo road. The land is approximately 5 acres. The project includes; 39 No. 3-room and 2-room and toilet units with an area of 50 & 30sqm respectively. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 08 months
Project Status: 100% (Handed over).

Ngumo Mbega Housing Project

The project is located 30km east of Nairobi town along Ruai-Kangundo road. The land is approximately 3 acres. The project includes; 20 No. 1-room and toilet units with an area of 15 sqm. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 06 months
Project Status: 100% (Handed over).

Royal Housing Project

The project is located 30km east of Nairobi town along Ruai-Kangundo road. The land is approximately 3 acres. The project includes; 50 No. 1-room and toilet units with an area of 16 sqm. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole

Project Duration: 08 months
Project Status: 100% (Handed over).