Alfa Mwanda Housing Project

The project is located in Nakuru town at Lanet area. The land is approximately 4.6 acres. The project includes; 33 No. Two-room and toilet units with a floor area of 23sqm. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 10 months
Project Status: 100% (practical completion & handed over).

See the below images of Housing project

Faith Foundation Housing Project

The project is located in Ruiru town along Nairobi-Thika Superhighway. The land is approximately 2.5 acres. The project includes; 52 No. Three-room and toilet units with an area of 50sqm. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 08 months
Project Status: 100% (Handed over).

See the below images of Housing project

Kabiria Housing Project

The project is located 30km North of Nairobi town at Kikuyu. The land is approximately 2.5 acres. The project includes; 37 No. Two-room and toilet units with an area of 32sqm all semi-detached. Alternative building technology adopted is use of box-profile metal sheets. Associated external works and services includes access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 03 months
Project Status: 50% (Construction in Progress).

See the below images of Housing project

Mutindwa/Good Neighbours Housing Project

The project is located 30km east of Nairobi town along Ruai-Kangundo road. The land is approximately 5 acres. The project includes; 39 No. 3-room and 2-room and toilet units with an area of 50 & 30sqm respectively. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 08 months
Project Status: 100% (Handed over).

See the below images of Housing project

Ngumo Mbega Housing Project

The project is located 30km east of Nairobi town along Ruai-Kangundo road. The land is approximately 3 acres. The project includes; 20 No. 1-room and toilet units with an area of 15 sqm. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole.

Project Duration: 06 months
Project Status: 100% (Handed over).

See the below images of Housing project

Royal Housing Project

The project is located 30km east of Nairobi town along Ruai-Kangundo road. The land is approximately 3 acres. The project includes; 50 No. 1-room and toilet units with an area of 16 sqm. Associated external works and services includes murram access roads, foul drainage and septic tanks, water reticulation and borehole

Project Duration: 08 months
Project Status: 100% (Handed over).

See the below images of Housing project