Brief Description:

The project is located 30km east of Nairobi town along Ruai-Kangundo road in Mavoko sub-county. The land is approximately 11 acres. The project adopts the incremental housing concept where a house is designed to be built and occupied in phases/classes. The project includes a mix of: 120 No. Two-room and toilet units with an area of 27sqm; 87 No. One-Bedroom units; (All fully sold) 21No. Two-Bedroom units (50% remaining). Associated external works and services includes: foul drainage and Communal septic tanks, water reticulation, internal murram roads and borehole.

20170708_111106 20170708_103613 20170708_103608